Process page An area (1500 x 2100)mm can be completed in
approx 10 minutes by two people. Road re-opened immediately after workers
move out.
Let’s
look at the procedures. 1. Sweep away loose debris, sand and
water if present. 2. Position the IRMA over the area,
remembering to heat about 150mm of existing asphalt around the affected area.
The surface should be heated around 5 to 8 minutes depending on the surface and the day temperature.
The surface by then should be approx the same temperature as the asphalt
leaves the plant. 3. Remove the IRMA and rake
the softened asphalt. 4. Spray a maltine
rejuvenator onto the heated asphalt. This will
replace the oils that have oxidised out over time. Rake in
the rejuvenator into the old asphalt. 5. Add new asphalt to the
correct level and use a wooden rake to level the area to the correct
grading. The area is now ready
for compaction. 6. Compact the area using a
vibrating roller or plate. Start the
compaction from the edge to ensure bonding between the old and
new surfaces. 7. The area is now fully
bonded and there are no cold joints
(weak joints) to come apart.
|
|
|